Categories
31210 D5830 GCRN T1LC

T1LC News – December 2024 and January 2025

31463 body work continues to be the focus of our work at the moment using the needle gun on the body to get the bulk of the paint off and then follow with a sander before we start to paint. ‘A’ body side is almost ready to be painted. When the temperature rises it will… Read More

Categories
31210 D5830 GCRN

T1LC News – April 2024

31463 31463 has had some more running tests and the results are good. Since the roof section went on the boiler / radiator room we were aware that the fan very slightly brushes the inside of the fan cowling. At the moment with engine testing the radiators don’t get hot enough the fan kicks in… Read More

Categories
1705 31210 31235 D5830 GCR GCRN

T1LC News – February and March 2024

31463 Since our last update prep work for the roof sections to be reunited with the loco was completed and these have been refitted. Work focused on reconnecting the cooling, fuel and electrical systems. The engine had an oil change and after final checks were completed the power unit was started. So far the engine… Read More