Galleries Scroll Down « back to albumDecember 2023 A side radiator area after cleaning and painting in primer. Photo by James WhincupThe radiator elements faces after being sanding flat and new studs being fitted. Photo by James WhincupThe radiator elements after being installed. Photo by Paul SeamanBoiler room concrete block underneath pre needle gunning. Photo by James WhincupBoiler room concrete block underneath after needle gunning and painting. Photo by James WhincupBoiler room concrete block ring after cleaning and painting. Photo by James WhincupBoiler room floor after cleaning and painting. Photo by James WhincupThe concrete block being craned back into the loco. Photo by Paul SeamanThe roof braces inside the u channel after being painted in hammerite. Photo by James Whincup31463 outside for steam cleaning. Photo by Paul Seaman