Galleries Scroll Down « back to albumAugust 2023 The table with a number of pistons with their new rings fitted. Photo by James WhincupThe second piston is warmed hanging from the crane. Photo by James WhincupThe gudgeon pin is fitted into the piston to hold the conrod. Photo by James WhincupPiston/connecting rod assembly with new rings ready for fitment. Photo by Steve RowstonThe toast rack is getting fuller with more pistons and connecting rods while another piston is warmed up. Photo by Steve RowstonOne of the exhausts after being steam cleaned. Photo by James WhincupThe heat sheilds for the inlet manifolds after shot blasting. Photo by James WhincupInlet manifold before/after cleaning up of flanges. Photo by James WhincupThe piston and connecting rod being lifted ready for fitting. Photo by James WhincupThe piston and connecting rod are being lowered through the 'tapered' 'piston pot.' This device compresses the piston rings as you lower the piston onto the cylinder liner. Photo by Steve RowstonAll 6 pistons are fitted to the engine 'B' bank. Photo by Steve RowstonIt's been a while since we've had an obstructed view through the crankcase doors, but very welcome nonetheless. Photo by James WhincupAll cylinder heads are on and the coolant block to cylinder head elbows fitted. Photo by James WhincupA bank exhaust ready for craning in. Photo by James WhincupB bank exhaust fitted to the cylinder heads and turbo. Photo by James Whincup